← index / hospital operations

Hospital — Operations

Predicted bed demand, readmission risk, OR utilization. For the COO / nursing lead / ED director.

hospital.averra.ae / ops
  • ◆ Operations
  • Patients
  • Predictive models
  • Integrations
  • Staffing
  • Financial
  • Quality
Operations · Al Qusais campus · 20 Apr
NABIDH ● Malaffi ● ADT · live
Occupancy
87%
ED waiting
14
OR util.
71%
Discharge pipeline
22
Capacity equivalent
+37 beds
saved this wk · method

Predicted bed demand · next 72h

capacity 320 now+24h+48h+72h

Top readmission risk · 30d

PatientRiskDriver
#A-1842● critCHF · polypharmacySNF
#B-0928◑ highPost-op infectionHome care
#C-2201◑ highPneumonia · elderlyRx review
#D-0412◐ modDiabetic footPodiatry

ALOS by DRG · vs benchmark

CABG Hip repl. PCI CHF ▲ above benchmark

OR utilization · idle slot optimizer

OR-1 · 82% · optimal
OR-2 · 64% · 2 idle slots
OR-3 · 48% · 3 idle · reallocate
OR-4 · 71% · optimal
Optimizer: AED 48k savings if OR-3 reallocated to Orthopedics Thu-Fri
↳ "+37 beds equivalent" uses methodology link (predictive-flow model); always accompanied by 95% CI in tooltip.
↳ Readmission table shows driver + suggested intervention — never raw risk score alone.
↳ Integrations panel (not shown): NABIDH · Malaffi · HL7 v2 ADT feed status.
← back to index